Do I need Building Regulations approval for a side extension?

Yes, unless it is an open carport or a small conservatory.

Putting up an extension is building work, so building control has to be told before you start, and the extension has to meet the requirements of the regulations. The exemption is narrow: a carport open on at least two sides, or a conservatory or covered way, at ground level and no bigger than 30 m², and a glazed conservatory only with safety glazing.

General guidance on the national rules for England, not advice about your home. Read the note

What decides it

The exemption is for a small addition at ground level, and only that.

Drawing of a side extensionA side extension cut through across its width, against the side wall of the house, with the boundary fence beyond it and a roof light in its roof. Beside it, a square of 30 square metres, the most an open carport or a conservatory at ground level may be and stay exempt. Letters mark the requirements: A at the foundation, B at the wall facing the boundary, C at the floor slab, L at the insulated roof and wall, F at the roof light, and P at the light.ABLCFPBoundarySectionFloor area30 m²
Each requirement lights up on the drawing as you reach it.

Separated

from the house, or the energy rules apply

The energy efficiency rules apply to a conservatory or porch if the wall, door or window between it and the house is taken out and not replaced, or if the house's heating is extended into it.

What an extension has to meet

The requirements in Schedule 1 to the regulations. For an extension at the side of a house, these are the ones that do the work.

H

Drains

If it is built over a drain or sewer on the water company's map of sewers, or could get in the way of one, it has to be built so that it does no harm to the building or the extension, and the drain or sewer can still be maintained. Where this applies you cannot use a building notice: building control needs a full plans application.

How it is usually met: Approved Document H, on gov.uk

Even if it is exempt

The order of things

  1. Before

    you start

    Give building control a building notice or a full plans application, then notice that work is starting at least two days before it does.

  2. During

    the work

    Within five days after the work counts as started (for an extension, once its foundations and ground-floor structure are complete), tell building control it has commenced. Building control can ask to be told when stages it means to inspect are reached, and for that work not to be covered up until it has been seen.

  3. After

    it is finished

    Within five days of finishing, tell building control the work is finished. Once satisfied that it meets the requirements, it gives you a completion certificate.

Other law that can apply

Separate from the Building Regulations, and often confused with them.

Building a wall on the boundary line, or right up to it on your side, means giving your neighbour at least a month's notice under the Party Wall etc. Act 1996.

Party walls and building work, on gov.uk

So does digging foundations within 3 metres of a neighbour's building to below the bottom of its foundations: a month's notice, with plans.

Cutting into a wall you share with a neighbour, to take the end of a beam for example, or raising or underpinning it, means serving a party structure notice under the Party Wall etc. Act 1996 at least two months before the work starts, unless your neighbours agree to it in writing.

Whoever has building work done is its “client” under the regulations. When it is your own home, your builder carries out most of the client's duties for you; where there is more than one contractor and you appoint nobody, the designer in control is treated as the principal designer and the contractor in control as the principal contractor.

Planning permission Do I need planning permission for a side extension?

Sources

Every statement above links to the clause it comes from. We read these on 2 October 2026.

Contains public sector information licensed under the Open Government Licence v3.0.