Coverage

East Riding of Yorkshire planning applications and permission: what actually gets approved

7,259 decided planning applications, read from East Riding of Yorkshire's own register, covering November 2023 to November 2026. Every figure below is a count of those decisions — not an estimate, and not a prediction about yours.

All building work in East Riding of Yorkshire

91%

of 2,632 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search East Riding of Yorkshire's register ↗

This is not East Riding of Yorkshire's planning register. To look up or comment on a live application, use the council's own site: search East Riding of Yorkshire's register.

Checked against the government's own count: we hold at least 100% of the decisions on planning applications East Riding of Yorkshire reported, in every quarter from 2024 Q1 to 2026 Q2.

91% of the 2,632 applications for building work East Riding of Yorkshire decided in the last three years were approved; half were decided within 54 days; 57% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.

Time to decide: half were decided within 54 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 2,632 decisions with both dates.

What East Riding of Yorkshire refuses work for

Of the 250 refusals whose decision notices we read, the share that gave a reason about each.

  1. Design and character of the area That the work suits the house and the street: its size, its shape, its roof and its materials.
  2. Neighbours' amenity That the neighbours keep reasonable light, outlook and privacy: no wall that looms over them, and no window that overlooks their home or garden more than the council judges acceptable.
  3. Heritage assets That the work does no harm to the character or appearance of a conservation area, or to a listed building, its setting or what makes it special. The council gives that great weight, and any harm needs clear justification.

Every reason, counted →

Approval rates by type of work

Before you apply

Whether the commonest kinds of work in East Riding of Yorkshire need planning permission at all, from the law itself, rule by rule.

Free check

Check your project

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Where East Riding of Yorkshire stands

The government's own count, every kind of application together: a different question from the rates above, which are one kind of work at a time. Why the figures differ.

England 87%East Riding of Yorkshire 90%60%, strictermore lenient, 100%England 87%East Riding of Yorkshire 90%60%, strictermore lenient, 100%
East Riding of Yorkshire granted 90% of the 1,794 applications it decided in the twelve months to June 2026, by the government's count: 116th most lenient of the 295 English councils counted, against 87% for England.

The long view

75%80%85%90%95%100%200020102020EnglandEast Riding of Yorkshire75%80%85%90%95%100%20002020EnglandEast Riding of Yorkshire
In 2025, East Riding of Yorkshire granted 89% of the 1,878 applications it decided; England as a whole, 87%. The government's figures: every kind of application together.

Every reason East Riding of Yorkshire gives, across all kinds of work →

Recent decisions in East Riding of Yorkshire

Straight from the register. Addresses are reduced to the street here; the report you get names the property.

Cottingham

Approved

Installation of a Battery Energy Storage System (BESS) compound with a 2.35m high palisade fence and a CCTV camera mounted to existing substation, a small extension to internal vehicular access road to BESS, realignment of an existing 2.4m high boundary fencing, partial relocation of ground mounted solar panels with associated infrastructure (Retrospective Application) and construction of attenuation basin and swale for surface water drainage to watercourse

Decided 20 November 2026 26/01795/PLF

Address withheld

Refused

Variation of Condition 8 (occupation of adjacent dwelling/ownership) of planning permission 14/03676/PLF (Erection of a warehouse/office building and increase in width of existing access road following demolition of existing equestrian and storage buildings) to allow the commercial building to be occupied by the dwelling's occupier/owner or let to a third party

Decided 20 November 2026 26/02575/VAR

Brandesburton

Approved

Permission in Principle - Erection of a dwelling, detached garage with associated parking, boundary wall and fence

Decided 20 November 2026 26/02806/PIP

By ward in East Riding of Yorkshire

Approval rates differ across a council. These are every ward we hold enough decisions for, each a page of its own.

  1. Hessle 95% of 173
  2. Cottingham South 95% of 96
  3. Willerby and Kirk Ella 94% of 239
  4. St Mary's 91% of 392
  5. East Wolds and Coastal 90% of 506
  6. Dale 90% of 288
  7. South Hunsley 89% of 262
  8. Bridlington Central and Old Town 89% of 146
  9. Pocklington Provincial 89% of 333
  10. Wolds Weighton 89% of 510
  11. Tranby 88% of 103
  12. Driffield and Rural 88% of 226
  13. Bridlington South 87% of 198
  14. Snaith, Airmyn, Rawcliffe and Marshland 86% of 210
  15. Minster and Woodmansey 86% of 269
  16. North Holderness 86% of 198
  17. Cottingham North 85% of 142
  18. Bridlington North 85% of 168
  19. South East Holderness 84% of 259
  20. Howdenshire 84% of 434
  21. Howden 83% of 114
  22. South West Holderness 83% of 185
  23. Goole North 83% of 76
  24. Beverley Rural 83% of 313
  25. Goole South 81% of 83
  26. Mid Holderness 81% of 318
Share of decisions granted in each ward of East Riding of Yorkshire, most first; the dashed line is these wards together, 87% of 6,241. Each ward counts every decision we hold there, of every kind and every year, so the line is not the figure at the top of the page. A ward with more of a harder kind ranks lower for that alone, and wards a few points apart may not differ at all.

Questions people ask

What is East Riding of Yorkshire's planning approval rate?

91% of the 2,632 applications for building work East Riding of Yorkshire decided in the last three years were approved, counting those that went one way or the other. It differs by kind of work.

What percentage of rear extension applications does East Riding of Yorkshire approve?

96% of rear extension applications decided by East Riding of Yorkshire were approved, over 795 decisions.

How many planning decisions does Plan Forecast hold for East Riding of Yorkshire?

7,259 decided applications, from November 2023 to November 2026, read from East Riding of Yorkshire's own planning register.

Is this East Riding of Yorkshire's planning website?

No. Plan Forecast is independent of East Riding of Yorkshire: we count the decisions on its public planning register. To look up, track or comment on an application, use East Riding of Yorkshire's own register, at newplanningaccess.eastriding.gov.uk.

Get the forecast for your address

These are East Riding of Yorkshire's figures as a whole. Put in your postcode and we will show you the rate for what you are planning, and the decisions on your own streets.

Free, in about a minute. We email it to you.

Figures are counts of published decisions, not planning advice. Every application is judged on its own merits. How these figures are made.