This is not Sutton's planning register. To look up or comment on a live application, use the council's own site: search Sutton's register.
85% of the 33 applications decided in Hackbridge, Sutton, between April 2025 and October 2026, were approved; half were decided within 56 days; across Sutton, 54% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.
Time to decide: half were decided within 56 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 30 decisions with both dates.
Across Sutton: what refusals were about
Of the 166 refusals whose decision notices we read, the share that gave a reason about each.
- Design and character of the area 54% That the work suits the house and the street: its size, its shape, its roof and its materials.
- Neighbours' amenity 39% That the neighbours keep reasonable light, outlook and privacy: no wall that looms over them, and no window that overlooks their home or garden more than the council judges acceptable.
- Not permitted development 25% That the work fits the permitted development route applied under: inside its limits and conditions and, where the council's prior approval is needed, acceptable on the matters it may judge, such as the neighbours. Work beyond the limits needs a planning application.
Sutton as a whole granted a comparable share across 2,183 decisions. See the whole council.
What people apply for here
| Type of work | Decisions | Approved |
|---|---|---|
| Rear extension | 13 | 100% a small sample |
| Two-storey extension | 5 | too few to say |
| Loft conversion or dormer | 5 | too few to say |
| Change of use | 2 | too few to say |
| Garden room or outbuilding | 1 | too few to say |
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Hackbridge Road Hackbridge
ApprovedRetention of the use of the property as Class C4 (small HMO) involving the erection of a part one, part two storey front, side and rear extension and formation of a new front entrance porch. Conversion of loft space involving alterations to existing roof line, removal of a chimney stack and a dormer extension at the rear.
Decided 30 October 2026 DM2026/00909
Spinning Wheel Way Hackbridge
ApprovedPart removal of a walled flower bed to allow for improved disabled access.
Decided 21 September 2026 DM2026/00754
Hackbridge
ApprovedErection of a two storey detached building comprising 6 self contained mixed use industrial units (Use Class ((B2/B8 and EGiii)), ancillary office space at mezzanine level with vehicle parking and cycle spaces, sub station and boundary treatment.
Decided 15 September 2026 DM2024/01755
Other work in Sutton
- Rear extension 655
- Two-storey extension 277
- Loft conversion or dormer 157
- Garden room or outbuilding 87
- Side extension 46
- New dwelling in a garden 33
- Garage conversion 30
Questions people ask
What percentage of planning applications in Hackbridge are approved?
85% were approved, over 33 decisions that went one way or the other. Sutton's figure across all types of work is drawn from 2,183 decisions.
How many planning decisions does Plan Forecast hold for Hackbridge?
33 decided applications whose postcode falls in Hackbridge, from April 2025 to October 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.