Two-storey extension planning permission in Brent: what actually gets approved

Decided by Brent between August 2025 and November 2026. Every figure here is a count of decisions on the council's own register — not a prediction about yours.

Two-storey extensions decided by Brent

75%

of 369 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search Brent's register ↗

This is not Brent's planning register. To look up or comment on a live application, use the council's own site: search Brent's register.

75% of the 369 two-storey extensions Brent decided between August 2025 and November 2026 were approved; half were decided within 56 days; 65% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.

Time to decide: half were decided within 56 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 369 decisions with both dates.

What Brent refuses two-storey extensions for

Of the 92 refusals whose decision notices we read, the share that gave a reason about each.

  1. Design and character of the area That the work suits the house and the street: its size, its shape, its roof and its materials.
  2. Insufficient information Drawings and details enough to judge the work: what the council's own list of requirements asks for, and anything its policies need shown.
  3. Highways and parking That the road outside stays safe to use and, where the council sets parking standards, that enough parking is left after the work.

Policies cited most: DMP1, Local Plan, BD1, Local Plan, BT2, Local Plan.

Every reason, counted →

Why they are refused What Brent's refusals of two-storey extensions were about Every refusal we read, sorted by the reasons the council gave →

Year by year

A year we hold only part of will show fewer decisions rather than a different rate, so read the count beside the percentage.

YearDecisionsApproved
202629272%
202513584%

Recent decisions

Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.

Sherrick Green Road, London

Refused

Non material amendment (Additional rooflight to front elevation and alteration to existing lower level roofs) of Householder application reference 26/0558 dated 14/05/2026 for Proposed first floor side extension to the dwellinghouse.

Decided 19 November 2026 26/2735

Manor House Drive, London

Approved

Demolition of rear extensions; proposed part-single-part-two storey rear extension; two storey front extensions with removal of side garage; front porch with balcony; re-roofing with 2x rear dormers and 10x rooflights; alteration to fenestration and front garden landscaping to dwellinghouse.

Decided 18 November 2026 26/2315

Elmstead Avenue, Wembley

Refused

Demolition of side-storage and rear kitchen and dining room and proposed part single part two-storey side to rear extension to dwellinghouse

Decided 18 November 2026 26/2364

By ward in Brent

Approval rates differ across a council. These are every ward we hold enough decisions for.

Before you apply

Free check

Check your extension

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Other work in Brent

Questions people ask

What percentage of two-storey extensions does Brent approve?

75% were approved, over 369 decisions that went one way or the other. Brent's figure across all types of work is drawn from 3,197 decisions.

How many two-storey extensions has Brent decided?

369 that went one way or the other, from August 2025 to November 2026.

Get the forecast for your address

The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.

Free, in about a minute. We email it to you.