100% of the 38 two-storey extensions Doncaster decided between August 2026 and November 2026 were approved; half were decided within 52 days. Plan Forecast, 24 November 2026.
Time to decide: half were decided within 52 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 38 decisions with both dates.
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Hatfield
ApprovedErection of a detached 2 storey garage and office
Decided 17 November 2026 26/01683/FUL
Austerfield
ApprovedErection of a two-storey side extension, including a master bedroom, bathroom facilities, utility room, ground-floor WC and home study,
Decided 17 November 2026 26/01947/FUL
Langthwaite Road Scawthorpe
ApprovedErection of a two storey side extension.
Decided 6 November 2026 26/01768/FUL
Before you apply
- Do I need planning permission for a two-storey extension?
- Do I need Building Regulations approval for a two-storey extension?
Free check
Check your extension
Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.
Other work in Doncaster
Questions people ask
What percentage of two-storey extensions does Doncaster approve?
100% were approved, over 38 decisions that went one way or the other. Doncaster's figure across all types of work is drawn from 369 decisions.
How many two-storey extensions has Doncaster decided?
38 that went one way or the other, from August 2026 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.