87% of the 105 applications decided in Exe Valley, East Devon, between November 2023 and November 2026, were approved; half were decided within 56 days; across East Devon, 55% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.
Time to decide: half were decided within 56 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 76 decisions with both dates.
Across East Devon: what refusals were about
Of the 124 refusals whose decision notices we read, the share that gave a reason about each.
- Design and character of the area 55% That the work suits the house and the street: its size, its shape, its roof and its materials.
- Heritage assets 27% That the work does no harm to the character or appearance of a conservation area, or to a listed building, its setting or what makes it special. The council gives that great weight, and any harm needs clear justification.
- Green Belt and open countryside 19% That the work is a kind the Green Belt or countryside policies allow. In the Green Belt, an extension must not be disproportionate to the original building.
East Devon as a whole granted a comparable share across 4,831 decisions. See the whole council.
What people apply for here
| Type of work | Decisions | Approved |
|---|---|---|
| Rear extension | 14 | 86% a small sample |
| Garden room or outbuilding | 12 | 92% a small sample |
| Two-storey extension | 11 | 82% a small sample |
| Loft conversion or dormer | 5 | too few to say |
| Front porch | 5 | too few to say |
| Change of use | 5 | too few to say |
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Stoke Canon
ApprovedConstruction of a further livestock building
Decided 13 November 2026 26/1112/FUL
Chestnut Crescent Stoke Canon Exeter
ApprovedGround floor drawing & dining room: carefully lift and remove existing floorboards and joists and replace, any salvaged to be reused elsewhere in the building; reduction of ground level where necessary beneath suspended floor to allow for build-up for the proposed breathable floor construction; installation of foam glass gravel sub-base across the floor area while maintaining appropriate distances from wall bases & foundations; installation of limecrete slab will be laid on top of the foam glass layer.
Decided 22 October 2026 26/0894/LBC
Address withheld
Prior approval refusedPrior notification of demolition of part of an agricultural building.
Decided 5 October 2026 26/1815/DEM
Other work in East Devon
- Rear extension 386
- Garden room or outbuilding 290
- Two-storey extension 266
- Loft conversion or dormer 195
- Front porch 104
- Side extension 88
- New dwelling in a garden 81
- Garage conversion 41
Questions people ask
What percentage of planning applications in Exe Valley are approved?
87% were approved, over 105 decisions that went one way or the other. East Devon's figure across all types of work is drawn from 4,831 decisions.
How many planning decisions does Plan Forecast hold for Exe Valley?
105 decided applications whose postcode falls in Exe Valley, from November 2023 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.