Coverage East Devon

New house in a garden planning permission in East Devon: what actually gets approved

Decided by East Devon between December 2023 and November 2026. Every figure here is a count of decisions on the council's own register — not a prediction about yours.

New dwellings in gardens decided by East Devon

53%

of 81 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search East Devon's register ↗

This is not East Devon's planning register. To look up or comment on a live application, use the council's own site: search East Devon's register.

53% of the 81 new dwellings in gardens East Devon decided between December 2023 and November 2026 were approved; half were decided within 83 days; 59% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.

Time to decide: half were decided within 83 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 81 decisions with both dates.

What East Devon refuses new dwellings in gardens for

Of the 37 refusals whose decision notices we read, the share that gave a reason about each.

  1. Design and character of the area That the work suits the house and the street: its size, its shape, its roof and its materials.
  2. Green Belt and open countryside That the work is a kind the Green Belt or countryside policies allow. In the Green Belt, an extension must not be disproportionate to the original building.
  3. Heritage assets That the work does no harm to the character or appearance of a conservation area, or to a listed building, its setting or what makes it special. The council gives that great weight, and any harm needs clear justification.

Policies cited most: National Planning Policy Framework, D1, Local Plan, TC2, Local Plan.

Every reason, counted →

Why they are refused What East Devon's refusals of new dwellings in gardens were about Every refusal we read, sorted by the reasons the council gave →

Year by year

A year we hold only part of will show fewer decisions rather than a different rate, so read the count beside the percentage.

YearDecisionsApproved
20262756%
20253266%
20243557%
20233too few to say

Recent decisions

Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.

All Saints Axminster

Approved

Demolition of cottage and erection of new dwelling

Decided 4 November 2026 23/2663/FUL

Budleigh Salterton

Approved

Construction of 35 dwellings (including open market and affordable), access and associated landscaping, open space and SUDS drainage

Decided 21 October 2026 25/0086/MFUL

Sidmouth

Approved

Formation of a new access onto Cotmaton Road, realignment of boundary wall and construction of a new dwelling

Decided 9 October 2026 26/1053/FUL

By ward in East Devon

Approval rates differ across a council. These are every ward we hold enough decisions for.

Free check

Check your project

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Other work in East Devon

Questions people ask

What percentage of new dwellings in gardens does East Devon approve?

53% were approved, over 81 decisions that went one way or the other. East Devon's figure across all types of work is drawn from 4,831 decisions.

How many new dwellings in gardens has East Devon decided?

81 that went one way or the other, from December 2023 to November 2026.

Get the forecast for your address

The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.

Free, in about a minute. We email it to you.