This is not East Devon's planning register. To look up or comment on a live application, use the council's own site: search East Devon's register.
87% of the 147 applications decided in Trinity, East Devon, between November 2023 and November 2026, were approved; half were decided within 58 days; across East Devon, 55% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.
Time to decide: half were decided within 58 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 115 decisions with both dates.
Across East Devon: what refusals were about
Of the 124 refusals whose decision notices we read, the share that gave a reason about each.
- Design and character of the area 55% That the work suits the house and the street: its size, its shape, its roof and its materials.
- Heritage assets 27% That the work does no harm to the character or appearance of a conservation area, or to a listed building, its setting or what makes it special. The council gives that great weight, and any harm needs clear justification.
- Green Belt and open countryside 19% That the work is a kind the Green Belt or countryside policies allow. In the Green Belt, an extension must not be disproportionate to the original building.
East Devon as a whole granted a comparable share across 4,831 decisions. See the whole council.
What people apply for here
| Type of work | Decisions | Approved |
|---|---|---|
| Rear extension | 18 | 83% a small sample |
| Two-storey extension | 17 | 94% a small sample |
| Change of use | 16 | 81% a small sample |
| Garden room or outbuilding | 12 | 67% a small sample |
| Loft conversion or dormer | 10 | 90% a small sample |
| Front porch | 3 | too few to say |
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Uplyme Lyme Regis
ApprovedProposed first floor rear extension with creation of an elevated rear entrance to include access stairs
Decided 20 November 2026 26/2033/FUL
Uplyme
ApprovedVariation of condition numbers 3, 4, 5, 6 and 7 on planning permission 22/1173/FUL (convert shippen and linhay to two dwellings, alterations to garage and installation of two wastewater treatment systems and a bat hibernaculum); variation of Condition 3 and removal of condition 4 following submission of temporary bat roosting provisions and bat hibernaculum details; Condition 5 to be amended to reflect the surface water drainage strategy provided; condition 6 to be amended to reflect the The Arboricultural Method Statement and Tree Protection Plan provided. Condition 7 to be amended to reflect the revised foul water drainage strategy provided
Decided 12 November 2026 26/0939/VAR
Combpyne Axminster
ApprovedChange of use to enlarge parking area and change access route. Insertion of doors, windows, mezzanine floor and infilling of one wall (previously the open elevation). Construction of open sided extension and timber cladding of exterior (development to facilitate the use as a farm shop permitted by 26/0835/PDR
Decided 12 November 2026 26/1691/FUL
Other work in East Devon
- Rear extension 386
- Garden room or outbuilding 290
- Two-storey extension 266
- Loft conversion or dormer 195
- Front porch 104
- Side extension 88
- New dwelling in a garden 81
- Garage conversion 41
Questions people ask
What percentage of planning applications in Trinity are approved?
87% were approved, over 147 decisions that went one way or the other. East Devon's figure across all types of work is drawn from 4,831 decisions.
How many planning decisions does Plan Forecast hold for Trinity?
147 decided applications whose postcode falls in Trinity, from November 2023 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.