This is not East Devon's planning register. To look up or comment on a live application, use the council's own site: search East Devon's register.
86% of the 104 applications decided in Seaton, East Devon, between November 2023 and November 2026, were approved; half were decided within 52 days; across East Devon, 55% of the refusals read were refused at least in part over design or the character of the area. Plan Forecast, 22 November 2026.
Time to decide: half were decided within 52 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 85 decisions with both dates.
Across East Devon: what refusals were about
Of the 124 refusals whose decision notices we read, the share that gave a reason about each.
- Design and character of the area 55% That the work suits the house and the street: its size, its shape, its roof and its materials.
- Heritage assets 27% That the work does no harm to the character or appearance of a conservation area, or to a listed building, its setting or what makes it special. The council gives that great weight, and any harm needs clear justification.
- Green Belt and open countryside 19% That the work is a kind the Green Belt or countryside policies allow. In the Green Belt, an extension must not be disproportionate to the original building.
East Devon as a whole granted a comparable share across 4,831 decisions. See the whole council.
What people apply for here
| Type of work | Decisions | Approved |
|---|---|---|
| Rear extension | 21 | 95% a small sample |
| Change of use | 8 | too few to say |
| Loft conversion or dormer | 7 | too few to say |
| Two-storey extension | 4 | too few to say |
| Garden room or outbuilding | 4 | too few to say |
| Front porch | 3 | too few to say |
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Seaton
ApprovedVariation of condition 3 (Approval of netting detail) and 4 (Removal of weld mesh fencing) on planning permission 25/1820/FUL (Proposal to demolish existing public toilets and replace with a new modular public toilet building. (Retrospective application for design changes to approved application 23/2561/FUL)) to extend the period of time for compliance, to allow for the need for specialist design and installation of the permanent netting system prior to the removal of the existing weld mesh fencing
Decided 9 November 2026 26/1803/VAR
Seaton
ApprovedExtension to the existing tram depot to provide additional internal storage and maintenance space
Decided 19 October 2026 26/1754/FUL
SEATON
ApprovedConstruction of 3 no. self-build dwellings and associated works
Decided 8 October 2026 26/0885/FUL
Other work in East Devon
- Rear extension 386
- Garden room or outbuilding 290
- Two-storey extension 266
- Loft conversion or dormer 195
- Front porch 104
- Side extension 88
- New dwelling in a garden 81
- Garage conversion 41
Questions people ask
What percentage of planning applications in Seaton are approved?
86% were approved, over 104 decisions that went one way or the other. East Devon's figure across all types of work is drawn from 4,831 decisions.
How many planning decisions does Plan Forecast hold for Seaton?
104 decided applications whose postcode falls in Seaton, from November 2023 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.