This is not East Hertfordshire's planning register. To look up or comment on a live application, use the council's own site: search East Hertfordshire's register.
90% of the 636 rear extensions East Hertfordshire decided between November 2023 and November 2026 were approved; half were decided within 55 days; 32% of the refusals read were refused at least in part over work outside permitted development. Plan Forecast, 22 November 2026.
Time to decide: half were decided within 55 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 636 decisions with both dates.
What East Hertfordshire refuses rear extensions for
Of the 66 refusals whose decision notices we read, the share that gave a reason about each.
- Not permitted development 32% That the work fits the permitted development route applied under: inside its limits and conditions and, where the council's prior approval is needed, acceptable on the matters it may judge, such as the neighbours. Work beyond the limits needs a planning application.
- Design and character of the area 29% That the work suits the house and the street: its size, its shape, its roof and its materials.
- Green Belt and open countryside 20% That the work is a kind the Green Belt or countryside policies allow. In the Green Belt, an extension must not be disproportionate to the original building.
Policies cited most: National Planning Policy Framework, DES4, HOU11.
Year by year
A year we hold only part of will show fewer decisions rather than a different rate, so read the count beside the percentage.
| Year | Decisions | Approved |
|---|---|---|
| 2026 | 240 | 90% |
| 2025 | 262 | 86% |
| 2024 | 264 | 89% |
| 2023 | 44 | 84% |
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Stockings Lane Little Berkhamsted Hertfordshire
RefusedPrior approval application (Part 1, Class A) for construction of single storey rear extension; depth extending from the original rear wall by 4.85 metres, a maximum height of 3.30 metres and an eaves height of 3.00 metres
Decided 19 November 2026 3/26/1443/PNHH
Milliners Way Bishops Stortford Hertfordshire
ApprovedConstruction of single storey rear extension
Decided 18 November 2026 3/26/1356/HH
Hertfordshire
ApprovedPrior Approval application (Part 1, Class A) for construction of single storey rear extension; depth extending from the original rear wall by 8.00 metres, a maximum height of 4.00 metres and an eaves height of 2.30 metres
Decided 18 November 2026 3/26/1430/PNHH
By ward in East Hertfordshire
Approval rates differ across a council. These are every ward we hold enough decisions for.
- Buntingford 79%
- Hertford Bengeo 81%
- Hertford Castle 88%
- Sawbridgeworth 80%
- Hertford Rural 69%
- Little Hadham & The Pelhams 75%
- Bishop's Stortford North 85%
- Braughing & Standon 84%
- The Mundens 80%
- Aston, Datchworth & Walkern 73%
- Much Hadham 81%
- Ware Priory 83%
- Bishop's Stortford Central 86%
- Hertford Kingsmead 90%
- Great Amwell & Stansteads 81%
- Ware Rural 76%
- Bishop's Stortford Parsonage 83%
- Bishop's Stortford All Saints 84%
- Hertford Heath & Brickendon 79%
- Bishop's Stortford Thorley Manor 91%
- Bishop's Stortford South 86%
- Watton-at-Stone 83%
- Ware St Mary's 81%
- Hertford Sele 85%
- Ware Trinity 87%
- Hunsdon 71%
Before you apply
- Do I need planning permission for a rear extension?
- Do I need Building Regulations approval for a rear extension?
Free check
Check your extension
Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.
Other work in East Hertfordshire
- Rear extension 636
- Two-storey extension 601
- Garden room or outbuilding 312
- Loft conversion or dormer 242
- Side extension 111
- Front porch 93
- Garage conversion 90
- New dwelling in a garden 82
Questions people ask
What percentage of rear extensions does East Hertfordshire approve?
90% were approved, over 636 decisions that went one way or the other. East Hertfordshire's figure across all types of work is drawn from 4,554 decisions.
How many rear extensions has East Hertfordshire decided?
636 that went one way or the other, from November 2023 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.