This is not Lambeth's planning register. To look up or comment on a live application, use the council's own site: search Lambeth's register.
66% of the 41 loft conversions and dormers Lambeth decided between September 2026 and October 2026 were approved; half were decided within 64 days. Plan Forecast, 4 November 2026.
Time to decide: half were decided within 64 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 41 decisions with both dates.
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Dorchester Drive London
RefusedErection of a part hip-to-gable roof extension and a rear dormer roof extension incorporating a stepped ridge, together with the installation of rooflights, an obscure-glazed window to the side elevation and solar panels above the rear dormer. dormer.
Decided 29 October 2026 26/02234/FUL
Knight's Hill London
RefusedFormation of a roof terrace above the existing rear outrigger roof with obscured glazed balustrade, replacement of part of the existing rear dormer window with a door, insertion of stepped access within the roof slope, and associated glazed link and balustrade.
Decided 27 October 2026 26/02504/FUL
Clapham Common South Side London
ApprovedThe installation of 2 no. AC condenser units to rear flat roof enclosed within acoustic enclosures and new extraction system, and replacement roof covering and a rooflight and the removal of a hatch.
Decided 21 October 2026 26/00969/FUL
Before you apply
- Do I need planning permission for a loft conversion?
- Do I need Building Regulations approval for a loft conversion?
Free check
Check your roof enlargement
Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.
Other work in Lambeth
Questions people ask
What percentage of loft conversions and dormers does Lambeth approve?
66% were approved, over 41 decisions that went one way or the other. Lambeth's figure across all types of work is drawn from 246 decisions.
How many loft conversions and dormers has Lambeth decided?
41 that went one way or the other, from September 2026 to October 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.