Coverage Mid Sussex

Loft conversion planning permission in Mid Sussex: what actually gets approved

Decided by Mid Sussex between November 2023 and November 2026. Every figure here is a count of decisions on the council's own register — not a prediction about yours.

Loft conversions and dormers decided by Mid Sussex

91%

of 245 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search Mid Sussex's register ↗

This is not Mid Sussex's planning register. To look up or comment on a live application, use the council's own site: search Mid Sussex's register.

91% of the 245 loft conversions and dormers Mid Sussex decided between November 2023 and November 2026 were approved; half were decided within 55 days. Plan Forecast, 22 November 2026.

Time to decide: half were decided within 55 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 245 decisions with both dates.

Year by year

A year we hold only part of will show fewer decisions rather than a different rate, so read the count beside the percentage.

YearDecisionsApproved
202611789%
202512889%
202411297%
202318100%

Recent decisions

Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.

Bolney Haywards Heath West Sussex

Approved

Permission is sought for internal and external alterations including creation of new openings in existing walls, installation of new staircase and bridge to connect the two sides of the lightwell at second floor, installation of new architectural mouldings and other details, replacement of existing rooflight, and refurbishment of the Second Floor Lounge to include installation of new joists, ceiling and two new fireplaces into existing fireplace openings.

Decided 19 November 2026 DM/25/3229

Bolney Haywards Heath West Sussex

Approved

Permission is sought for internal and external alterations including creation of new openings in existing walls, installation of new staircase and bridge to connect the two sides of the lightwell at second floor, installation of new architectural mouldings and other details, replacement of existing rooflight, and refurbishment of the Second Floor Lounge to include installation of new joists, ceiling and two new fireplaces into existing fireplace openings.

Decided 19 November 2026 DM/25/3228

Bonnet Lane Burgess Hill West Sussex

Approved

Proposed loft conversion with 2 no. front roof windows

Decided 16 November 2026 DM/26/2311

By ward in Mid Sussex

Approval rates differ across a council. These are every ward we hold enough decisions for.

Before you apply

Free check

Check your roof enlargement

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Other work in Mid Sussex

Questions people ask

What percentage of loft conversions and dormers does Mid Sussex approve?

91% were approved, over 245 decisions that went one way or the other. Mid Sussex's figure across all types of work is drawn from 3,965 decisions.

How many loft conversions and dormers has Mid Sussex decided?

245 that went one way or the other, from November 2023 to November 2026.

Get the forecast for your address

The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.

Free, in about a minute. We email it to you.