Two-storey extension planning permission in Nottingham: what actually gets approved

Decided by Nottingham between November 2023 and November 2026. Every figure here is a count of decisions on the council's own register — not a prediction about yours.

Two-storey extensions decided by Nottingham

91%

of 297 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search Nottingham's register ↗

This is not Nottingham's planning register. To look up or comment on a live application, use the council's own site: search Nottingham's register.

91% of the 297 two-storey extensions Nottingham decided between November 2023 and November 2026 were approved; half were decided within 70 days. Plan Forecast, 22 November 2026.

Time to decide: half were decided within 70 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 297 decisions with both dates.

Year by year

A year we hold only part of will show fewer decisions rather than a different rate, so read the count beside the percentage.

YearDecisionsApproved
20268793%
20259586%
202412196%
20232479%

Recent decisions

Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.

Staverton Road Nottingham Nottingham City

Approved

Demolition of the existing garage, construction of a two-storey side extension and front porch, and retrospective permission for a single-storey rear extension as constructed, which differs from that approved under planning permission 25/02130/PFUL3.

Decided 20 November 2026 26/01562/PFUL3

Parkside Nottingham Nottingham City

Approved

Addition of a dual pitched roof to the existing two-story flat roof rear extension. Erection of a two-storey pitched roof rear extension. Erection of a single storey rear and side extension. Installation of external wall insulation to the front, side and rear elevations. Application of white render to the front, side and rear elevations. Installation of photovoltaic panels to the roof. Demolition of two chimney stacks.

Decided 2 November 2026 26/01046/PFUL3

Newcastle Drive Nottingham Nottingham City

Refused

Two storey rear ground and lower ground floor extension with below ground basement level parking. Replacement rear balcony and front entrance gates with decorative ironwork. Removal of imitation front door to Newcastle Drive elevation. Reinstatement of north east lower ground floor entrance with new lightwell to existing utility room window Landscaping to existing rear garden.

Decided 2 November 2026 26/01578/PFUL3

By ward in Nottingham

Approval rates differ across a council. These are every ward we hold enough decisions for.

Before you apply

Free check

Check your extension

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Other work in Nottingham

Questions people ask

What percentage of two-storey extensions does Nottingham approve?

91% were approved, over 297 decisions that went one way or the other. Nottingham's figure across all types of work is drawn from 3,500 decisions.

How many two-storey extensions has Nottingham decided?

297 that went one way or the other, from November 2023 to November 2026.