This is not Thurrock's planning register. To look up or comment on a live application, use the council's own site: search Thurrock's register.
78% of the 50 two-storey extensions Thurrock decided between June 2026 and November 2026 were approved; half were decided within 63 days. Plan Forecast, 24 November 2026.
Time to decide: half were decided within 63 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 50 decisions with both dates.
Recent decisions
Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.
Hyde Close Chafford Hundred Grays Essex
ApprovedPart single storey, part two storey rear extension.
Decided 19 November 2026 26/01126/HHA
South Ockendon Essex
ApprovedFirst floor rear extension and change of use and conversion of the former station building (Sui Generis) use into a large HMO (Sui Generis) use, providing 26 studio rooms, with associated parking and landscaping.
Decided 18 November 2026 26/00286/FUL
London Road Stanford Le Hope Essex
Approved(Part-retrospective) Erection of a two-storey building comprising a hot food takeaway (Sui Generis) and storage ancillary to the existing retail unit at ground-floor level, with office and storage accommodation ancillary to the existing retail unit at first-floor level, together with associated extraction equipment.
Decided 18 November 2026 26/00996/FUL
By ward in Thurrock
Approval rates differ across a council. These are every ward we hold enough decisions for.
Before you apply
- Do I need planning permission for a two-storey extension?
- Do I need Building Regulations approval for a two-storey extension?
Free check
Check your extension
Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.
Other work in Thurrock
Questions people ask
What percentage of two-storey extensions does Thurrock approve?
78% were approved, over 50 decisions that went one way or the other. Thurrock's figure across all types of work is drawn from 441 decisions.
How many two-storey extensions has Thurrock decided?
50 that went one way or the other, from June 2026 to November 2026.
Get the forecast for your address
The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.