Two-storey extension planning permission in Lambeth: what actually gets approved

Decided by Lambeth between May 2026 and October 2026. Every figure here is a count of decisions on the council's own register — not a prediction about yours.

Two-storey extensions decided by Lambeth

72%

of 32 decisions approved

Counting decisions that went one way or the other.

Get the forecast for your address Search Lambeth's register ↗

This is not Lambeth's planning register. To look up or comment on a live application, use the council's own site: search Lambeth's register.

72% of the 32 two-storey extensions Lambeth decided between May 2026 and October 2026 were approved; half were decided within 56 days. Plan Forecast, 5 November 2026.

Time to decide: half were decided within 56 days, counted from the day the application was valid (or received, where the register gives no valid date) over the 32 decisions with both dates.

Recent decisions

Real decisions, newest first. Addresses are reduced to the street here; the council publishes them in full on its own register.

Brixton Road London

Approved

Variation of Conditions 3 (Demolition plans) and 5 (Basement impact assessment) of planning permission 21/01127/FUL (Demolition and redevelopment of 1 - 9 Dorrell Place together with change of use of upper floors of 452 - 456 Brixton Road and basement and first floors of 11 Dorrell Place with restoration and repair works to retained facades and two storey side extension to 11 Dorrell Place to provide a 96 bedroom hotel in a part two, part three, part five storey building (Use Class C1), retention of front facade and refurbishment of existing retail unit (Use Class E(a)) at basement and ground floor levels at 452 - 456 Brixton Road and installation of new shopfronts at ground floor level, retention of existing public house (sui generis)) at basement and ground floor levels at 11 Dorrell Place and associated cycle parking, plant, refuse store and landscaping works.) Granted on 03.01.2024. Amendment sought: Wording of Condition 3 - Demolition plans Wording of Condition 5 - Basement impact assessment

Decided 3 November 2026 25/03931/VOC

Sydenham Place London

Approved

Redevelopment of former commercial unit (Use Class E) to provide a part-existing/part new-build two-storey, four-bed dwelling (Use Class C3) with the provision of a front amenity courtyard, rear garden and refuse/cycle storage.

Decided 23 October 2026 26/02030/FUL

Hilldown Road London

Approved

Erection of a first floor rear extension.

Decided 14 October 2026 26/02437/FUL

By ward in Lambeth

Approval rates differ across a council. These are every ward we hold enough decisions for.

Before you apply

Free check

Check your extension

Put a pin on your house, describe the work, and see it measured against each permitted development limit, with the clause it comes from. A guide, not a guarantee.

Check it free →

Other work in Lambeth

Questions people ask

What percentage of two-storey extensions does Lambeth approve?

72% were approved, over 32 decisions that went one way or the other. Lambeth's figure across all types of work is drawn from 902 decisions.

How many two-storey extensions has Lambeth decided?

32 that went one way or the other, from May 2026 to October 2026.

Get the forecast for your address

The figures above are the council. A forecast is your postcode: the same rate, the time a decision takes, and what happened on nearby streets. Free, and we email it to you.

Free, in about a minute. We email it to you.